Home > Projects > ST / CSP - utility - Imperial Valley, CA, USA, 750MW Profile

ST / CSP - utility - Imperial Valley, CA, USA, 750MW

General Info
Sector ST / CSP - utility
Type
Country USA Flag USA
Region California
Project size (MW) 750
Project Status Development
More Projects in ST / CSP - utility
More Companies in ST / CSP - utility
Latest News
Japan: 3 Things Investors Must Consider
3/22/2011 1:45:31 AM, Yahoo finance
Can Google help turn trash into gasoline?
3/22/2011 1:45:31 AM, Yahoo finance
Top 3 Reasons Markets Dialed in to AT&T
3/22/2011 1:45:31 AM, Yahoo finance
U.S. Movie Box Office Grosses for March 18 - March 20
3/22/2011 1:45:31 AM, Yahoo finance
Analysis: U.S. gas market eyes nuclear outages at home
3/22/2011 1:45:31 AM, Yahoo finance
Tools & Attachments
Short Description
The proposed Imperial Valley Solar/SES Solar Two project would be a nominal 750-megawatt (MW) Stirling engine project, with construction planned to begin either late 2009 or early 2010. Although construction would take approximately 40 months to complete, renewable power would be available to the grid as each 60-unit group is completed. The primary equipment for the generating facility would include the approximately 30,000, 25-kilowatt solar dish Stirling systems (referred to as SunCatchers), their associated equipment and systems, and their support infrastructure. Each SunCatcher consists of a solar receiver heat exchanger and a closed-cycle, high-efficiency Solar Stirling Engine specifically designed to convert solar power to rotary power then driving an electrical generator to produce grid-quality electricity. The 6,500 acre project site is located on approximately 6,140 acres of federal land managed by the Bureau of Land Management (BLM) and approximately 360 acres of privately owned land. The site is approximately 100 miles east of San Diego, 14 miles west of El Centro, and approximately 4 miles east of Ocotillo Wells.

The project will be constructed in two phases. Phase I of the project will consist of up to 12,000 SunCatchers configured in 200 1.5-MW solar groups of 60 SunCatchers per group and have a net nominal generating capacity of 300 MW. Phase II will add approximately 18,000 SunCatchers, expanding the project to a total of approximately 30,000 SunCatchers configured in 500-1.5-MW solar groups with a total net generating capacity of 750 MW
Map
Connected Companies
Developer Tessera Solar
Debt financing NA
EPC NA
Primary equipment vendor NA
Operator Tessera Solar
PPA
Other NA
Attachments
eXenewable database is being updated on an ongoing basis. Help us to improve data accuracy and relevance by contributing additional information about listed projects and companies. If you are professionally connected to specific projects or companies and you can contribute relevant information updates please contact us